. OPERATION TRANSPORTATION PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE WARNING Reducing Track Gauge center frame mounting bolts (1). (one side, front + side, on the 3 - 146 Never use the machine for operations with th e track frame 1. Remove rear: 20 2. Swing th e upper stru cture so th at it is at 90° on th e side of tr ack frame (A ) to be retra cted, then use t he wor k equipmen t to jack up the tr ack frame. 3. Set bloc ks (B) (20 to 30 cm (8 t o 12 in ) wooden blocks) t owards the outs ide of track f rame (A) , then use th boom cylinde r to lower th e machine s lowly. Th e trac (A) wil and stop wh en it contact s the stopper. 4.
Lower t he machine carefully and i front + r ear: 8 bolts o ut of bolt s (1)) Tightening torque: 2 452 - 304 0 Nm 50 - 310 kgm, 1810 - 2245 lbft track frame 5. other si