Komatsu — WHEN REQUIRED

. MAINTENANCE MAINTENANCE PROCEDURE REPLACE BUCKET TEETH (KMAX) Replace teeth WARNING turn it 4 - 29 Replace the bucket teeth before the ada pter starts to we It is dangerous if th e work equipment mov es by mista ke whe n the t eeth are being replaced. o the LOCK position. Set the work equip ment in a stable conditi on, then sto p the e ngine and set the lock lever securely t There is a hazard th at fragments will fly dur ing the repl acemen t work , so always wear protective equi pment like safety glasses and gloves. If the tooth pins c replacement.

annot be removed in this procedure, for safety's sake, be sure to ask your Komatsu distributor for the If Prepare for a soc ket wrench for 14 m m- width a cross f For machines of loading specification s, prepare for a s ocket wrenc h for 16 mm- width ac 1. Set the bucket w ith the bottom of the bucket on block (3 ) so t hat pin (1) can be r emoved, then stop th e engine. 2. Within 15 seco nds after stopping the engin e, mo ve each control lever (fo r work equipment an d travel) t o the fu ll stroke in all directions to release the interna l pressure . 3. Check that the work equipment is in a stable co ndition, then set the lock lever to the LOCK position ( L). 4.

Fit a socket w rench to the head of pin (1 ), the counterclockwi se 90° to release the lock of the pin.