. MAINTENANCE MAINTENANCE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING carried out. down The pressure in the hydraulic circuit can be released. 4 - 74 The a ccumulator is charged wi th high-pressure nitrogen gas, so mistaken operatio n may ca use an explosion, which will lead to seriou s injury or damage. Whe n handling the accumulator, alway s do as follows. Th e pressure in the hydraul ic circuit cannot be completely re moved. When removing th e hydraulic equipment, d o not stand he direction that the oil s purts out when carrying out the op eration. In additio n, loose n the bolts slowly when carrying out operation.
Do not disassemble the acc Do not bring it near flame o Do not make holes in it or w Do not hit it, roll it, or subje Wh en disposing of the acc umulator, the gas must be release d. Please contact your Ko mats u distributor to ha ve this work NOTIC E If the nitrogen gas charge pres sure in the accumulator is low and operations are co ntinued, it wil l become impossib le to release the re maining pressure inside the hydraulic circuit if a failure occ urs on the machi ne. FUNCTION OF ACCUMUL ATOR e pressure in the control circui The a ccumulator stores th after the engine is stopped, the control circuit can be oper the fo llowing actions are po ssible.
If t he control lever is ope rated in the direction to lower t eq un uipment, it is possibl e for the work equipment to g der its own weight. The a ccumulator is installe on th e right.