4M41 ENGINE - Piston and Connecting Rod 11B-23-3 *b PRE-REMOVAL INSPECTION 1. PISTON PROTRUSION FROM CRANKCASE TOP Caution Do not fail to check piston protrusions. The engine performance are directly influenced by them. (1) Position each piston at the TDC. (2) There are five reference points A on the upper crankcase *b that serve as a zero level each. Check piston protrusions with respect to these reference points. (Piston protrusion = Measuring point B - Reference point A) (3) Measure piston protrusions at two points per cylinder (8 in total) using the closest reference point, and average the readings.
(4) If the average deviates from the specified standard value, check clearances at necessary points. Standard value: -0.20 - -0.30 mm (5) Select the cylinder head gasket having a thickness that corresponds with the average of piston protrusions (measured at 8 points). 2. CONNECTING ROD END PLAY (1) Measure end play of each connecting rod. (2) If the measurement exceeds the specified service limit, replace defective part. Standard value: 0.15 - 0.45 mm Limit: 0.6 mm REMOVAL SERVICE POINTS A A " NUT REMOVAL A 5 Caution Provide one punch mark A on the head of the nut 1 each time it is used to tighten the connecting rod bolt 14.
If it has three punch marks (the evidence of having been tightened 3 times), replace both the nut 1 and the connecting rod bolt 14. 14 1 MH060014 A B " PISTON RING REMOVAL Using the special tool, remove each piston ring. PWEE9409-D E Feb. 2000 Mitsubishi Motors Corporation Added