46 Pre-Commissioning QA Inspection EP COMMISSIONING & SUPPORT SERVICES (800) 789-9774 Customer Service (562) 463-7192 Fax Server Date iMACs PROJECT #: Project Name Stock Order ID #: Purchase Order #: 0 Package Serial #: 0 EQUIPMENT TYPE: Generator 0 0 Please select ( Yes, No, Not Applicable, Need Assistance) Room General COMPLETED?
Generator set clean with all guards in place No loose materials near to generator set Air ducts clear and clean Access & egress routes unobstructed & labelled Control & maintenance positions unobstructed Room secure – no unauthorised access Generator set is level – holding down bolts secure Pipework and cables are secure with no trip hazards Overhead obstructions clearly marked and labelled All key components are labelled Pipework and services colour coded & labelled Electrical bonding complete 0 Cooling System Set mounted radiator Radiator clean, free from obstruction Radiator air outlet connected to outlet duct Check for possibility of hot air recirculation Access to coolant top-up Engine vent pipes inclined toward radiator Pipework secure and undamaged Overflow clear and routed to avoid spillage Remote mounted radiator systems Header tank is of adequate size Overflow is clear and routed to avoid spillage Static/friction head is within engine/system capability Engine vent pipes inclined toward radiator Fuel cooler installed if required Pipework avoids air locks – air bleed valves provided Pipework isolated from generator set vibration Pipework complete, cleaned, tested & painted Auxiliary supply to fans correctly installed Electrical bonding completed Heat exchanger & cooling tower systems Header tank is of adequate size Overflow is clear and routed to avoid spillage Static/friction head is within engine/system capability Engine vent pipes inclined toward header tank Fuel cooler installed if required Pipework avoids air locks – air bleed valves provided Pipework isolated from generator set vibration Pipework complete, cleaned, tested & painted Secondary cooling system is complete Cooling tower make up supply is complete Auxiliary supply to fans correctly installed Electrical bonding completed 0