Caterpillar — Ventura County Fire Protection Fire Station No. 30 Submittal 03.27.13.pdf

Pre-Commissioning QA Inspection EP COMMISSIONING & SUPPORT SERVICES (800) 789-9774 Customer Service (562) 463-7192 Fax Server Date iMACs PROJECT #: Project Name Stock Order ID #: Purchase Order #: 0 Package Serial #: 0 EQUIPMENT TYPE: Generator 0 0 0 ( Yes, No, Not Applicable, Need Assistance) Liquid fuel system Bulk storage facility COMPLETED?

Bulk storage tank installation complete Bulk tank incorporates water trap Spillage containment complete Isolating valves correctly positioned Tank contents gauge installed Content alarm contacts fitted & wired Transfer pump installed and connected Solenoid & pre-filter between bulk & service tank Pipework correct material, cleaned tested & painted Vent installed, piped to safe area and open Electrical bonding complete Insulation & pipeline heating installed Fill point installed & alarm fitted Storage facility secure Day tank (if none, complete check for bulk supply) Positive head at engine for critical applications Fuel inlet head/restriction within engine limits Fuel return head/restriction within engine limits Isolating and solenoid valves fitted Check for no valves in spill return Flexible connections to engine Connection to fill, overflow & vent lines completed Overflow head of fuel within tank pressure limits Tank contents gauge installed Contents alarm contacts fitted & wired Electrical bonding complete Spillage containment complete Fire valves & contacts installed & wired 0 Gaseous fuel system Pipework complete, material and construction correct Regulator and shut off valves in correct locations Leak test and certification complete 0 Fire alarm / suppression system Fire alarm / suppression system complete Sensors protected from radiant heat Labelling and lock off system complete 0 Starting system Battery starting Starting batteries correct & installed on tray or stand Battery cables routed correctly Battery charger installed & wired Compressed air / hydraulic starting Compressor set installed and wired Compressed air pipework correctly rated & installed Isolating valves correctly positioned & labelled Pipework tested, painted & labelled Correct pressure regulator & HP/LP safety valves Flexible connection to engine fitted 0 47