MAINTENANCE 4 Swing Bearing --- every 250 hours d WARNING: Before lubricating the swing bearing, lower the bucket and the blade to the ground, stop the engine, and place the pilot control shut-off lever to the LOCK position. Lubrication and rotation of the upperstructure must be done by one person only. Be sure to check that no personnel are present around the machine before starting to work. Grease via grease fittings Swing Gear Swing Bearing M1NC-00-001 1. Lower the bucket and the blade to the ground, stop the ZX14-3, 16-3, 18-3 engine, and place the pilot control shut-off lever to the LOCK position. Add grease with a grease gun by two to three strokes.
Lower the bucket and blade to the ground. 2. Raise the bucket approx. 200 mm (8 in) above the ground. While rotating the upperstructure, add grease in 8 places at approximately every 90° interval until the upperstructure has made two turns. M1M7-07-025 Swing Gear Swing Bearing ZX27-3 7-19