hitachi — Hitachi ZX14-3/ZX16-3/ZX18-3/ZX27-3 Hydraulic Excavator Operator's Manual

MAINTENANCE 2 Replace Bucket O-Ring Shift d WARNING: When driving the connecting pins in or out, guard against injury from flying pieces of metal or debris; wear a helmet, goggles or safety glasses, heavy gloves and safety equipment appropriate for the job. Select a spacious job site with good footing. Start working only after ensuring the safety of other personnel around the machine. Avoid quick operation of the front attachment. Give the highest priority to safety when engaging in teamwork by strictly exchanging safety signs. Bucket Boss Link A B Removal 1. Park the machine on a level surface. Lower the bucket to the ground and position it with the flat surface resting on the ground.

Be sure the bucket will not roll when the pins are removed. 2. Slide the O-rings out of the specified position to the M104-07-063 bucket boss side. 3. Remove bucket pins A and B to separate the arm and bucket. Installation 1. Clean the removed pins and pin bores. Apply sufficient grease to the pins and pin bores. 2. Place a new bucket in a stabilized position. 3. Join the arm to hole A and the link to hole B with pins. 4. Securely install the lock washers to all pins. 5. Reinstall the sealing O-ring to the specified position. 6. Apply grease to all pin joints. 7. Start the engine and run it at slow idle.

Slowly operate the bucket in both directions to check for any interference in bucket movement. 7-66