hitachi — Hitachi ZX14-3/ZX16-3/ZX18-3/ZX27-3 Hydraulic Excavator Operator's Manual

MAINTENANCE 3 Adjust Track Sag (Rubber Crawler) and Check for Damage --- daily Proper track sag adjustment is necessary to extend the service life of the rubber track and the travel device. Check Track Sag As illustrated to the right, raise the one side track which sag is to be measured, off the ground. Place blocks under machine frame to support the machine. Rotate the rubber track so that the track joint is positioned at the upper center of the track. Measure distance (A) from the bottom of the lower roller tread to the inner ridge of the rubber track. M1M7-04-006 Adjusting Track Sag 1.

If track sag is not within specifications, loosen or tighten the track following the procedures shown on the next page. 2. Before adjusting track sag, lower the bucket to the ground to raise one track off the ground. Be sure to place blocks under machine frame to support the machine. Joint 3. After adjusting track sag of both tracks, run the tracks back and forth several times to equalize the track sag on both side tracks. Joint M588-07-055 M102-07-075 4. After doing so, check track sag again. If track sag is not within specifications, repeat adjustment until the correct sag is obtained. Check Rubber Track for Damage A Roller Check the rubber track for damage.

If any, consult your authorized dealer for repair. Track Sag (Rubber Crawler) M503-05-050 Side a 7-67 Dimension Track Sag Specifications A in mm (in) 10 to 15 (0.39 to 0.59)