USING THE WORK EQUIPMENT Never use your fingers to check on the alignment of holes. Unexpected movements can easily shear fingers. BUCKET POSITIONS The bucket can be fitted in either of two positions: Pos. 1: for normal digging operations; affords maximum force at the bucket. Pos. 1 Pos. 2: for working on vertical walls; affords maximum rotation and working height, but reduced tearing force at the bucket. Pos. 2 F00163 22.3 POSITIONING THE MACHINE FOR DIGGING DANGER Before moving the equipment, make sure that there is no-one in the work area. When working on a slope, make sure that the working brake is engaged before moving the equipment.
Try out all possible machine movements to check that the control levers are work- ing correctly. If visibility is poor, or there are pipes or cables in the area, work at a reduced pace and engage the assistance of a second person. 1 - Position the machine in line with the trench to be dug. IMPORTANT If this is not possible because of the presence of walls or banks, rotate the boom to the side and line the machine up alongside the proposed trench. 87