Komatsu — 32.2.1 FITTING THE DEMOLITION HAMMER

AUTHORISED OPTIONAL EQUIPMENT Lay the demolition hammer flat on the ground, with the tip facing the machine. Wear thick gloves, safety goggles and a hard hat when fitting the demolition ham- mer. Splinters of metal can form when the coupling pins are fitted and removed. Two people are required to fit and remove the demolition hammer. Agree on instructions and signals before you start work. Never use your fingers to check on the alignment of holes. Fingers can easily be sheared by unexpected movement. Move all the controls a few times and remove the hydraulic tank filler cap to elimi- nate all residual pressure from the hydraulic system before starting to fit the demo- lition hammer.

Clean up any oil or fluid spillages immediately. Couple the demolition hammer to the arm as instructed in section 22.5.1 UNCOUPLING BUCKETS. After the hammer has been mechanically fitted, connect up the hydraulic lines as follows: 1 - Stop the engine and move all the controls a few times to release all residual pressure from the hydraulic system. 2 - Turn the ignition key to position « I » and press down on the hammer control push-button to release all residual pressure from the hammer circuit. 4 - Using 41 and 50 mm spanners, remove the plugs from the hydraulic hoses of the ham- mer circuit on the machine and on the hammer itself.

3 - Return the ignition key to position « O » and remove the key. 5 - Make sure that the sizes of the unions correspond and connect the right hand hose to union (1) and the left hand hose to union (2). 1 1"5/8-12 JIC 1 F00707 D00365 148