Komatsu — REMOVAL

DISASSEMBLY AND ASSEMBLY TORQUE CONVERTER, TRANSMISSION 15. Brake hoses 1) Disconnect hose (83) between transmission and power master cylinder at transmission end. 2) Disconnect tube (84) between torque converter charging pump and power master cylinder at torque converter charging pump end. 16. Remove mounting bolt of cushion valve (85). Ъ Set the cushion valve on top of the rear frame lower hinge. 17. Hydraulic, steering pump 1) Disconnect hoses (86) and (87) between hydraulic, steering pump and priority valve at priority valve end. 2) Remove tube (88) between hydraulic, steering pump and hydraulic tank. 3) Lift off hydraulic and steering pump (89) together with hose. 30-37 WA250-3L