Komatsu — INSTALLATION

DISASSEMBLY AND ASSEMBLY MAIN CONTROL VALVE 5) Tube (8) for boom cylinder Ъ Loosen U-bolt (9) for securing the boom cylinder tube. 5. Install eye bolts to frame at top of main control valve, sling main control valve (10), then remove mounting bolts (11), and lift off. Main control valve: 21 kg Ъ When raising the main control valve, be careful to fit the lifting equipment securely. INSTALLATION ! Carry out installation in the reverse order of removal. Boom tube: 176.5 ± 38.3 Nm (18.0 ± 3.9 kgm) (width across flats: 36 mm) Bucket hose: 176.5 ± 38.3 Nm (18.0 ± 3.9 kgm) (width across flats: 36 mm) Hydraulic hose: 196.1 ± 49.0 Nm (20.0 ± 5.0 kgm) (width across flats: 41 mm) U-bolt:

18.6 ± 7.9 Nm (1.9 ± 0.8 kgm) ! Refilling with oil Add hydraulic oil through oil filler to the specified level. Ъ Run the engine to circulate the hydraulic oil through the system. Then check the oil level again. 30-162 WA250-3L