Komatsu — REMOVAL

DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT 4. Boom arm, tilt lever, bucket link 1) Remove boom kickout switch (7). 2) Sling lift arm, tilt lever and bucket link (8),remove mounting pin of lift arm, then lift off lift arm. Lift arm, tilt lever, bucket link assembly: 830kg Ъ If there are any shims, check the number and thickness of the shims, and keep in a safe place. 5. Tilt lever, bucket link 1) Sling bucket link (9), remove mounting pin (10), then remove bucket link from tilt lever. Bucket link: 25kg 2) Sling tilt lever (11), remove mounting pin (12), then lift off from lift arm. Tilt lever: 145kg 30-191 WA250-3L