. OPERATION OPERATION OPERATION OF WORK EQUIPMENT STARTING JAW CRUSHER OPERATION WARNING Park the machine on the level and solid ground and start the work. In order to avoid abnormal vibration, while the machine is in operation, check that the outermost track rollers are in firm contact with the primary belt conveyor in the reverse order of the confirm that the feeder is in motion. NOTICE 3 - 61 ground at four When somethin stop switch (4). A buzzer begins points. g unusual occurs on the machine, depress emergency to sound then, and the jaw crusher, grizzly feeder, belt conveyor and optional working equipment (magnetic separator and side conveyor), if installed, will stop. 1.
Lower the p procedures f 2. Turn belt co nveyor starting switch (1) the belt is moving. to the ON position and and confirm that 3. Turn crusher starting switch (2) to the ON position and confirm 4. that the crus Turn grizzly her is rotating. feeder starting switch (3) to the ON position and Run the engine at a low idling speed (low revolution) without any load for abou t five minutes . 5. After the m achine warming-up, check if there is no bearing of abnormally high temperature or abnorma accelerating the engine suddenly until after the engine is sufficiently warmed up. l control dial to the full speed (MAX) to raise the crusher revolution. vibration.
Refrain from accelerating the engine s uddenly until after t he engine is sufficiently warm 6. Turn the fue l control dial to the full spe ed (MAX) to raise t he crusher revolution. 7. When the cr usher revolution has risen sufficiently and becomes constant after turning th e fuel control dial to the full speed, b egin to feed debris to the crusher. emergency stop switch (depress it again to do so) and start it again peration. For restartin g the crusher, release the following the procedures for crusher o