. OPERATION OPERATION set forth in the section "STARTING JAW (PAGE 3-61)", 3 - 90 3. Enter th e interior of the machine through the side of e ngine fr ame to remove the remaining reinforcing b ars. earth sp illage p reventive rubber plates tha t were 4. After all the reinforcing bars hav e been r emoved, atta ch detache d in Item 2 abo NOTICE Be sure to pu sh in th e rubber p art of the e arth spilla ge preventive plates o n to the p rimary c onveyor frame surface after attaching them to the machine 5. Followi nstructio start th e work CRUSHER OPERATION