eng — SCOPE OF WORKS USING MOBILE CRUSHER

. OPERATION OPERATION 3 - 91 CRUSHING NATURAL ROCKS NOTICE If natural r ocks are fed and c rushed togeth er with debris of high water content (earth, san d, etc.), not on ly the grizzly f eeder may be clogge d, bu t also the pa ckings at the c rusher outlet an d fixed and swing j aw crushe r plates may b e worn out pr ematurely. To avoid s uch troubles, us e an excavator equipped with a skeleton bucket, when loadi When crushing natural rock s, do not set t he clearance at t he crusher outlet i n the range of 55 to 100 m m (2.2 to 3.9 in) for fear of damage s on the machine and prematur e wear of the fix ed and swing jaw plates.

When crushing boulders co llected in a rive rbed, s et t he cru sher spee d control dial to the MIN position, t hereby preve nting them from flyin g off or floating a nd eventually enhancing the w ork efficiency The mobile and riverbe The of 100 to 2 00 mm ( 3.9 to 7.9 i n) by adjustin g the clearanc e at the j aw crusher