eng — PROCEDURE FOR DISASSEMBLY AND FORLDING

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 98 8. Remove 9 b olts, open the portion a t the top o f the right flywheel cover, then fold it ove 9. Remove 10 bolts, ope n the portion at the top of the left flywheel cover, then fold it ove NOTICE After er, tighten both the left and right covers securely with bolts to hold in po sition to pr even t play du ring transportation. 10. Remove the 4 steps i nstalled to th e side of the track. 11. Raise the pr imary belt conveyor a nd set it t o the trave l posture. For details, see "MOVING MACHINE (P AGE 3-55)". 12. Assemble in the reverse o rder fro m disassembly and folding.