eng — CHECK AND ADJUST TRACK TENSION

. MAINTENANCE SERVICE PROCEDURE CHECK AND ADJUST TRACK TENSION WARNING 4 - 33 Let this jo b be carried out by t wo workers in pair. One of the two will se rve as an operator a nd the other as a servicem an. The operator tr avels the machine at a signal from the servic eman and must b e ready to stop it any Inspection and tightening work s of the track shoe ass embly are to be carried out with the machine at a raised positio extremely dangerous to let it fa ll by accident, so never move the machin e, while an inspection The wear of pins and bushin gs on the undercarria ge will vary with the working condit ions and types of soil.

It is thus necessar y to continually ins pect the track tension so as to maint ain the standard te Carry ou t the check and ad justment under the s ame conditions becomes clogged with mud, measure with the tra ck clogged with The stan dard clearance of A between the track fr and track The mea shoe upper face i surement method i s 331 ± 20 mm (13.0 ± s as explained below. 1. Place a wooden block o f 100 mm i3.9 in) in h eight on the fla groun the s d. Back the machi ne up to climb and res t on the block a procket. 2. Meas ure the dimension from the track frame b ottom surface t the to and t p of the track shoe at the midpoint betwe en the sprocke he third (center) tra ck roller.

If the trac k tension is not at the standard value, ad just it in the fol