eng — CHECK AND ADJUSTMENT OF JAW CRUSHER

. MAINTENANCE SERVICE PROCEDURE REPLACEMENT OF TOGGLE PLATE REMARK plate, pass a wire rope through a 4 - 50 1. Remove rubber plate (1) and swing jaw cover (2). 2. Detach each working deck in the order of crusher interior maintenance floor (3) and crusher front maintenance floor (4). 3. Remove rubber cover (2) that is spread over the toggle plate. (M10 bolt x 10 pieces) 1. Remo ve rubbe r plate (1) 2. Detac h each working maintenance fl oor (3) and 3. Remo ve rubbe r cover (2) (M10 b olt x 10 pieces 4. Pass a wire ro pe through lift it up provisionally. Insert the eyeb olt through Tool to use Eyebo lt (M20): Accessory When repl oggl long hole on the to ggle plate, lift it up pr ovisional