. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE CAUTION 4 - 49 6. he hook of cra ne to fix the swing j aw plate wedg Swing jaw pla te wedge weight: 76 7. Fix wire ropes to the hooks on both sides of swing jaw p late ( and lift it up. Swing jaw pla te weight: 1110kg (2 448 lb)] After detaching the s wing jaw plate , complet ely remove soils , sand , etc. fro m the swin g jaw plate fitting surfaces (s uppe r surface of swi ng jaw plate mount sto pper and transverse st oppe r piece) If not removed comp letely, they may cause a backlash on th e swi ng ja w plate. When reversing the swing jaw plate, lower it o n to a bloc k once.
Then fix a wire ro pe on the oppos u p and push it b ack into the crusher frame. When replacing the swing jaw plate, lower the wor n plat e on to a block o nce. Lift up a new swing j a wire rope and insert it into the crusher frame. 8. Secure swing jaw plate wedge (3) and swing jaw plate wedge bolts (1). Set the length (B) of the fixed jaw plate wedge bolt spring at 103 mm (3.9 in) to 105 mm (4.13 in). a wire rope and insert it into the crus her frame 8. Secure swing jaw plate wedge (3) and swing jaw plate bolts (1). Set the length 103 mm (3.9 i n) to 105 mm (4.13 in