. OPERATION OPERATION CAUTION body. Checking method 3 - 42 CHECK OF BEAR-LOC CYLINDER FOR LOCKING Confirmation o f locking force befo re starting opera After adjustin g the clearance at the outlet of the crus her jaw, be sure to carry out a trial o peration under t he trial con ditions of engine revolu tion at low idling and crusher revolutio n at MIN a nd confirm t hat there is no abnormal n oise from ar ound the toggle block. When inserti ng shim plates, confir m the total numbe r and thickness o f the right and left shims to ensu re the ident ical shim plate thickne ss on both sides.
Should the sh im plate thickness diff er between the rig ht and the left side s, there would be a critical damag e to the crus her main Fo ocking force may be t contact of the shims or fine f oreign objects caug ht between the When adjustm ent was made of th e clearance at the outlet the crusher due to the wear on the swi ng jaw plate and fixed jaw plate, tighten the shi m plates (toggle bloc k) every 30 minu tes of operation until no backla Hit the shim pl ates and the toggle block pins with a hammer to see if t here is any backlash.
REMARK If t he backlash can be settled by n o means, remo ve all the shims once by pushing the toggle bl ock to the extreme front end, follo wing the same proc edure for the ja w crushe r outlet clearance adjus tment, and th en blow th em with an air or water gun to remove fore ign objects.