OPERATIONAL PERFORMANCE TEST / Component Test MAIN PUMP FLOW RATE MEASUREMENT P-Q Control (Torque Control) Summary: Main pump performance is checked by measuring the pump flow rate by using a hydraulic tester in- stalled at the main pump delivery port (one side) to be measured. Use Dr. ZX and a hydraulic tester at the same time. IMPORTANT: This measurement procedure is a simple method. The measured data will be lower by approx. 5 % than the accurately measured value. In order to measure accurately, dis- connect the return circuit from the control valve and connect it to the hydraulic oil tank. Preparation: 1. Stop the engine. Push the air bleed valve and bleed air.
Connect a vacuum pump to the oil filler port. 5. Connect Dr. ZX and select the monitor function. When Dr. ZX is not available, use the pressure gauge. Install a pressure gauge to the main pump to be measured. (Refer to “Main Relief Set Pressure”.) : 6 mm 6. Disconnect the pipe from the port Psv (12). Con- nect hose (ST 6339) (14) to the disconnected the pipe hole on regulator to be measured. Install plug (ST 6212) to the disconnected the pipe hole on regulator not to be measured. 7. Remove the vacuum pump. Loosen plug (13) on top of the pump casing. Bleed air from the casing until oil only comes out. 8. Fully open the loading valve of hydraulic tester (5). 9. Start the engine.
Check the pressure gauge and hydraulic tester (5) connection for any oil leaks. Measurement: 1. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). 2. Measure the maximum flow rate. 3. Measurement conditions are below. NOTE: Operate the vacuum pump while connect- ing the pump flow rate test line. 2. Disconnect the delivery hose from main pump (one side) to be measured. Connect pipe (1 or 2) by using the split flanges and bolts which were used for the disconnected delivery hose. : 10 mm 3. Connect pipe (1 or 2) to hydraulic tester (5) by using test hose (3) and adapter (4). Install adapter (6), joint (7), test hose (8) and flange (9) to hydraulic tester (5). : 41 mm 4.
Adjust the relief set pressure of main relief valve in control valve to each pressure point specified along the main pump P-Q curve. (Refer to T4-2-5) Slowly restrict the loading valve of hy- draulic tester while relieving pressure in the arm roll-in circuit. Measure the flow rates and engine speeds at each pressure point specified in the P-Q curve. 5. Repeat the measurement three times and calcu- late the average values. : 41 mm : 10 mm 4. Connect the delivery hose to flange (9) with split flanges (10) and bolt (11). : 10 mm T4-5-14 Engine Control Dial Power Mode Switch Auto-Idle Switch Work Mode Fast Idle P Mode OFF Digging Mode