OPERATIONAL PERFORMANCE TEST / Component Test FAN PUMP FLOW RATE MEASUREMENT P-Q Control (Torque Control) Summary: Fan pump performance is checked by measuring the pump flow rate by using a hydraulic tester in- stalled at the fan pump delivery port (one side) to be measured. Use a hydraulic tester. IMPORTANT: This measurement procedure is a simple method. The measured data will be lower by approx. 5 % than the accurately measured value. In order to measure accurately, dis- connect the return circuit from the control valve and connect it to the hydraulic oil tank. Preparation: 1. Stop the engine. Push the air bleed valve and bleed air. Connect a vacuum pump to the oil filler port. 5.
Disconnect the pipe from the port Pr (12). Con- nect hose (ST 6339) (14) to the disconnected pipe hole on regulator to be measured. Install plug (ST 6212) to the disconnected pipe hole on regulator not to be measured. 6. Remove the vacuum pump. Loosen plug (13) on top of the pump casing. Bleed air from the casing until oil only comes out. 7. Fully open the loading valve of hydraulic tester (5). 8. Start the engine. Check the pressure gauge and hydraulic tester (5) connection for any oil leaks. Measurement: 1. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). 2. Measure the maximum flow rate. 3. Measurement conditions are below. NOTE:
Operate the vacuum pump while connect- ing the pump flow rate test line. 2. Disconnect the delivery hose from fan pump to be measured. Connect pipe (1 or 2) by using the split flanges and bolts which were used for the disconnected delivery hose. 4. Adjust the set pressure of relief valve in fan valve to each pressure point specified along the fan pump P-Q curve. (Refer to T4-2-6) Slowly restrict the loading valve of hydraulic tester. Measure the flow rates and engine speeds at each pressure point specified in the P-Q curve. 5. Repeat the measurement three times and calcu- late the average values. : 41 mm : 10 mm 3.
Connect pipe (1 or 2) to hydraulic tester (5) by using test hose (3) and adapter (4). Install adapter (6), joint (7), test hose (8) and flange (9) to hydraulic tester (5). : 10 mm 4. Connect the delivery hose to flange (9) with split flanges (10) and bolt (11). : 41 mm : 10 mm T4-5-16 Engine Control Dial Power Mode Switch Auto-Idle Switch Work Mode Fast Idle P Mode OFF Digging Mode