OPERATIONAL PERFORMANCE TEST / Component Test SWING MOTOR DRAINAGE Summary: 1. Measure amount of oil draining from the swing motor while swinging the upperstruc- ture and check the swing motor perform- ance. 2. The amount of drain oil from the swing motor will change depending on hydraulic oil tem- perature. Preparation: 1. Maintain hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Rotate the swing motor in order to warm inside of the motor. 2. Stop the engine. Push air bleed valve (1) on top of the hydraulic oil tank and release any remain- ing pressure. 1 A : 4 mm 3. Measure the left swing motor drainage: Disconnect drain hose (2) at part B.
Connect the test drain hose (3/4-16UN) to the motor side and plug (ST 6637) to drain hose (2). Measure the right swing motor drainage: Disconnect right drain hose (1) at part A. Install plug (ST 6491) on the tee side. : 27 mm : 93 N x m (9.5 kgf x m, 70 lbf x ft) 2 CAUTION: Prevent personal injury. Always make sure that the area is clear and that co-workers are out of the swing area before starting machine operation. Also, take care not to fall off the machine Preconditions for Measurement: 1. Measurement conditions are below. T1JB-04-05-005 B Machine Front Side T4-5-22 Engine Control Dial Power Mode Switch Work Mode Auto-Idle Switch Fast Idle HP Mode Digging Mode OFF