OPERATIONAL PERFORMANCE TEST / Component Test Measurement: 1. Amount of Oil Drained While Swinging the Upperstructure (1) With the bucket empty, position the front attachment as follows: Backhoe: With the arm cylinder fully retracted, and the bucket cylinder fully extended, raise the boom so that the arm tip pin heigh is flush with the boom foot pin height. Loading Shovel: With the arm cylinder and the bucket cylinder fully extended, raise the boom so that the arm tip pin height is flush with the boom foot pin height. (2) Start the engine. Operate and hold the swing lever full stroke. Start draining oil measurement after the swing speed eaches a constant maximum speed.
The measuring time should be more than 20 seconds. (3) Repeat the measurement three times in both clockwise and counterclockwise directions, and calculate the average values. 2. Amount of Oil Drained While Relieving Swing Motor Circuit (1) Thrust the bucket teeth into the ground as illustrated so that the upperstructure does not rotate when the swing lever is operated full stroke. (2) Start the engine. Operate and hold the swing lever full stroke. Start drain oil measurement when drain oil starts coming out of the drain hose end. The measuring time should be more than 20 seconds.
(3) Repeat the measurement three times in both clockwise and counterclockwise directions, and calculate the average values. The height as the boom foot pin height. T105-06-03-013 TBAR-04-04-001 NOTE: Because the left swing motor drain hose is connected to the right swing motor drain port, the total of the left and right swing motor drainage will be measured when measuring the right swing motor drainage according to step 4 in Preparation. For this reason, be sure to deduct the amount of left swing motor oil drainage (step 3 in Preparation) from that total amount. Evaluation: Refer to the Performance Standard Table in Group T4-2.
Conversion of the amount of drain oil measured into the per-minute value First measure the amount of drain oil by using a calibrated container. Then, convert the measured drain oil into the per-minute value by using the formula below: T107-06-05-008 Q = 60 Ч q / t Where: Q : Amount of drain oil per minute (L/min) t : Measured time (seconds) q : Total amount of drain oil (L) T4-5-23 The height as the boom foot pin height .