hitachi — PREPARATION FOR PERFORMANCE TESTS

OPERATIONAL PERFORMANCE TEST / Adjustment TORQUE ADJUSTMENT Adjust pump drive torque, sum of main pumps 1, 2, by using Dr. ZX. (Refer to the T/M (SYSTEM) section.) IMPORTANT: These procedures are for only adjustment without repair. When main pump drive torque need to increase or decrease, do these procedures. Adjustment Start Condition: MC, ECM: No breakdown and No malfunction (by using Dr. ZX) Engine output horsepower: Normal Hydraulic oil temperature: 50 ± 5 ° C (122 ± 41 ° F) Procedure 1. Connect Palm (Dr. ZX) to the diagnosing connector in the cab by using the Hot Sync cable and connecting harness. 2. Turn the key switch ON or start the engine. 3.

When turning Palm ON, the following screen is displayed on the display of Palm. 3-1. Initial Screen Select Dr. ZX icon. 3-2. Password Setup Screen (When the password has unset) Set the password. 3-3. Service Software Selection Screen Dr. ZX Connector T1J1-04-06-001 Select Large Class ZX-3. + 3-4. Function Selection Screen Self-Diagnostic Result Select Controller + + Palm Dr. ZX 5. Select “Select (Controller)” and operate according to the instruction under display screen. Hot Sync Cable Onnecting Harness T1V1-05-07-002 T4-6-7