TROUBLESHOOTING / Troubleshooting B Work After Replacing Components The following work is required after replacing compressor, high pressure hose, low pressure hose, condenser, receiver tank, liquid hose and air conditioner unit. The same work is required when gas leakage is found. 1. Add compressor oil Oil amount: 180 cm 3 (0.19 qt) 2. Charge air conditioner with refrigerant Purging Charge air conditioner with refrigerant Warm up operation Inspection T5-4-106