OPERATIONAL PERFORMANCE TEST / Excavator Test TRAVEL SPEED Summary: Measure the time required for the excavator to travel a 20 m (65.6 ft) test track. Preparation: 1. Adjust the track sag on both side tracks equally. 2. Prepare a flat and solid test track 20 m (65.6 ft) in length with extra length of 3 to 5 m (9.8 to 16 ft) on both ends for machine acceleration and de- celeration. IMPORTANT: The bucket teeth will hit the boom if the bucket is rolled-in with the arm fully rolled-in. As for this condition: arm fully rolled-in + Bucket fully rolled-in, set the bucket at fully rolled-in and a perform arm roll-in operation. 3.
Hold the bucket 0.3 to 0.5 m (12 to 20 in) above the ground with the arm and bucket rolled in. 4. Maintain hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Measurement: 1. Measure both the slow and fast speeds of the machine. 2. Measurement conditions are as below. Arm Rolled-In, Bucket Rolled-In Bucket Height: 0.3 to 0.5 m End Start 20 m Deceleration Zone 3 to 5 m Acceleration Zone 3 to 5 m T105-06-03-001 3. Start traveling the machine in the acceleration zone with the travel levers to full stroke. 4. Measure the time required to travel 20 m (65.6 ft). 5. After measuring the forward travel speed, turn the upperstructure 180 ° and measure the reverse travel speed. 6.
Perform the measurement three times and cal- culate the average values. Evaluation: Refer to the Performance Standard Table in Group T4-2. Remedy: Refer to the Troubleshooting B in Group T5-7. T4-4-1 Travel Mode Switch Engine Control Dial Power Mode Switch Work Mode Auto-Idle Switch Slow Mode Fast Idle HP Mode Digging Mode OFF Fast Mode Fast Idle HP Mode Digging Mode OFF