hitachi — PREPARATION FOR PERFORMANCE TESTS

OPERATIONAL PERFORMANCE TEST / Excavator Test TRACK REVOLUTION SPEED Summary: Measure the track revolution cycle time with the track raised off ground. Preparation: 1. Adjust the track sag of both side tracks to be equal. 2. Put the mark on the track to be measured, by using a piece of chalk. 3. Swing the upperstructure 90 ° and lower the bucket to raise the track off ground. Keep the boom-arm angle between 90 to 110 ° as shown. Place blocks under the machine frame. 90 ° to 110 ° CAUTION: Securely support the raised track using wooden blocks. 4. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Measurement: 1.

Measure the both tracks on forward and reverse directions at each travel mode. 2. Measurement conditions are as below. M104-07-067 90 ° to 110 ° T1J1-04-04-001 3. Operate the travel control lever of the raised track to full stroke. 4. Measure the time required for 3 revolutions in both directions after a constant track revolution speed is obtained. 5. Perform the measurement three times and cal- culate the average values. Evaluation: Refer to the Performance Standard Table in Group T4-2. NOTE: The measurement data obtained through the raised track revolution test may have wide variations.

Therefore, the evaluation based on the results obtained from the 20 m travel speed check described before is more recommendable. Remedy: Refer to the Troubleshooting B in Group T5-7. T4-4-2 Travel Mode Switch Engine Control Dial Power Mode Switch Work Mode Auto-Idle Switch Slow Mode Fast Idle HP Mode Digging Mode OFF Fast Mode Fast Idle HP Mode Digging Mode OFF