hitachi — PREPARATION FOR PERFORMANCE TESTS

OPERATIONAL PERFORMANCE TEST / Excavator Test Loading Shovel Boom Cylinder: With the bucket cylinder and the arm cylinder fully extended, lower the bucket to the ground. Arm Cylinder: With the arm fully retracted, position the bucket so that the rear bucket does not come in contact with the arm stopper. Then, adjust the boom cyl- inder stroke to position the bucket bottom 1 m (39 in) above the ground. Bucket Cylinder: With the bucket closed and held in a load dump position, adjust the boom cylinder stroke so that bucket bottom height is approx. 1 m (39 in) above the ground. Bucket Open-Close Cylinder:

With the bucket cylinder and arm cylinder fully extended, adjust the boom cylinder stroke so that the bucket bottom height approx. 1 m (39 in) above the ground. 3. Perform the measurement three times and cal- culate the average values. Evaluation: Refer to T4-2 Operational Performance Standard. Remedy: Refer to the T5-7 Troubleshooting B. Loading Shovel Boom Cylinder TBAR-04-04-003 Arm Cylinder TBAR-04-04-004 Bucket Cylinder TBAR-04-04-005 Bucket Open-Close Cyl- inder TBAR-04-04-006 T4-4-12