OPERATIONAL PERFORMANCE TEST / Excavator Test BOOM RAISE/SWING COMBINED OP- ERATION CHECK Summary: Check boom raise and swing movement speeds while operating both functions simultaneously. Preparation: 1. Start the engine and run it at fast idle. Operate the boom raise function and check to be sure that the cylinder movement is smooth, with out stick- ing. 2. Position the machine with front attachment posi- tioned as illustrated and with the bucket empty. 3. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). T142-05-03-007 CAUTION: Prevent personal injury. Always make sure that the area is clear and that co- workers are out of the swing area before starting the measurement.
Measurement: 1. Measurement conditions are as below. T142-05-03-008 2. Raise the boom and swing simultaneously. 3. When the upperstructure rotates 90 ° , release the control levers to stop both functions. Measure the time required to swing 90 ° and the height (H) of the bucket teeth. 4. Perform the measurement three times and cal- culate the average values. Evaluation: Refer to the performance Standard Table in Group T4-2. Remedy: Refer to the Troubleshooting B in Group T5-7. T107-06-03-010 H T107-06-03-011 T4-4-16 Engine Control Dial Power Mode Switch Work Mode Auto-Idle Switch Fast Idle HP Mode Digging Mode OFF