. MAINTENANCE PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS 4 - 17 NO.
Safety critical parts for periodic replacement Q'ty Replacement interval 21 Hose between PPC divider block and work equipment lock valve 2 Every 2 years or 4000 hours, whichever comes sooner 22 Hose between the oil cooler bypass valve and hydraulic oil cooler 2 23 Hose between self pressure reducing valve and drain relay block 1 24 Hose between main control valve and drain relay block 1 25 Hose between fan motor and hydraulic tank 4 26 Hose between self pressure reducing valve and work equipment lock valve block 1 27 Hose between work equipment lock valve block and main control valve 2 28 Hose between main control valve and hydraulic tank 1 29 Hose between hydraulic pump and main control valve 2 30 Hose between main control valve and ripper relay block (fixed multi-shank ripper) 2 31 Hose between main control valve and ripper relay block (variable multi-shank ripper) 4 32 Hose between oil cooler bypass valve and hydraulic tank 1 33 Hose between ripper relay block and ripper cylinder (fixed multi-shank ripper) 2 34 Hose between ripper relay block and ripper cylinder (variable multi-shank ripper) 4 35 Hose between main control valve and blade tilt relay cover 4 36 Hose between main control valve and blade relay tube 2 37 Hose between drain relay block and hydraulic tank 1 38 Hose between radiator guard top and lift cylinder 4 39 Hose between fan pump and drain relay block 1 40 Hose between accumulator and work equipment lock valve 2 41 Hose between hydraulic pump and hydraulic pump 1 42 Accumulator (for control circuit) 1 43 Seat belt 1 Every 3 years 44 High-pressure piping clamps 1S Every 8000 hours 44 Fuel spray prevention cap 1S