. MAINTENANCE SERVICE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING carried out. down 4 - 85 The a ccumulator is charged wi th high-pressure nitrogen gas, so mistaken operation may cause an e xplosion, which will lead to seriou s injury or damage. Whe n handling the accumulator, alway s do as follows Th e pressure in the hydraul ic circuit cannot be completely re moved. When removing the hydrau lic equipment, do no t stand he direction that the oil s purts out when carrying out the op eration. In addition, loosen the bol ts slowly when carry ing out operation.
Do not disassemble the acc Do not bring it near flame o Do not make holes in it or w Do not hit it, roll it, or subje Wh en disposing of the acc umulator, the gas must be release d. Please contact y our Komatsu di stributor to have th is work NOTIC E If the nitrogen gas charge pres sure in the accumulator is low and operations are continued, it will be come impossible to release the re maining pressure inside the hydraulic circuit if a failure oc curs on the machine . FUNCTION OF ACCUMULATO R e pressure in the control circui The a ccumulator stores th after the engine is stopped, the control circuit can be oper the fo llowing actions are po ssible.
If t eq he control lever is ope uipment, it is possibl rated in the direction to lower t e for the work equipment to g un der its own weight. raulic circuit can be released. Th e pressure in the hyd The a ccumulator is installe d to the position shown in the on th e right.