MAINTENANCE PROCEDURE MAINTENANCE EVERY 100 HOURS MAINTENANCE LUBRICATING NOTICE G For the first 100 hours on new machines where the parts are settling in, carry out greasing every 10 hours. G After digging operations under water, be sure to grease the pins which were submerged. 1. Set the work equipment in the greasing posture below, then lower the work equipment to the ground and stop the engine. 2. Using a grease pump, pump in grease through the grease fittings shown by arrows. 3. After greasing, wipe off any old grease that was pushed out. (1) Swing pinion (1 point) When lubricating the swing pinion, turn the chassis little by little and apply grease through the gerase fitting.
(2) Swing circle (1 point) (3) Bucket cylinder rod end (1 point) (4) Link coupling pin (1 point) (5) Bucket - Link coupling pin (1 point) (6) Arm - Bucket coupling pin (1 point) (7) Arm - Link coupling pin (1 point) 4-42