. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS NOTICE the right. After inserting the pin, fit the O-ring correctly in the groove. Install the stopper bolts and nuts for each pin, then grease the pin. 3 - 118 2. Remove the sto pper bolt s and nuts , then re move pins (A) and B), and remov e the buc After removing the pin s, make su re tha t mud or sand d oes not get on th em. Dust seal s are fitted at both ends of the bushings, be c areful n ot to damage them 3.
Alig n the arm w ith holes (1) of the re placem ent bucket and the ink with holes ( 2), then i nsert grease-coate (A) and (B) nto hole (1) an d hole (2) respective REMARK Carry out installation in th e reverse order to r emoval. Whe n installing the bucke t, it is easy to dama ge the O- ring , so