Air Intake and Exhaust System Install Turbocharger IMPORTANT: If turbocharger failed because of foreign material entering the air intake system, be sure to examine the system and clean as required to prevent a repeat failure. 02 080 16 RG8172 –UN–05DEC97 If not done previously, prime (prelube) the turbocharger rotating assembly prior to mounting turbocharger on engine. Prelube center housing with clean engine oil through the oil drain hole. Turn rotating assembly by hand to lubricate bearings. (See PRELUBE TURBOCHARGER earlier in this group.) Guide Pins as Assembly Aid 1. Install two guide pins (A) in front turbocharger mounting holes as shown.
Install stainless steel gasket (B) over guide pins. 2. Position turbocharger on stainless steel gasket and exhaust manifold. RG8187C –UN–05DEC97 3. Apply PT569 NEVER-SEEZ Compound to turbocharger cap screws and tighten to specifications. Specification Turbocharger-to-Exhaust Manifold—Torque 50 (37 lb-ft) ............................................................ Installed Turbocharger 4. If removed, apply LOCTITE 242 Thread Lock and Sealant to turbocharger oil inlet fitting and install and tighten to specifications.
A—Guide Pins B—Gasket C—Oil Return Pipe D—Oil Inlet Line Specification Turbocharger Oil Inlet Fitting— Torque 50 (37 lb-ft) ............................................................................. 5. Apply PT569 NEVER-SEEZ Compound to oil return pipe cap screws. Install oil return pipe (C) to turbocharger using a new gasket. Tighten oil return pipe cap screws to specifications. Specification Turbocharger Oil Return Pipe-to-Turbocharger—Torque 50 (37 lb-ft) ........................................ NEVER-SEEZ is a registered trademark of the Emhart Chemical Group. LOCTITE is a registered trademark of Loctite Corp.
CTM100 (06APR04) 02-080-16 P OWER T ECH 10.5 L & 12.5 L Diesel Engines Continued on next page RG,RG34710,247 –19–13AUG99–1/2 040604 PN=316