Theory of Operation 24—Auxiliary (Not used) 32—Arm, Boom, Bucket 37—Boom, Arm, Left Travel 44—Right Travel Sensor 25—Swing and Auxiliary 33—Arm, Boom Swing Auxiliary Shuttle Valve 26—Swing 34—Boom, Arm, Swing, 38—Right Travel 45—Left Travel Sensor Shuttle 27—Boom Auxiliary 39—Left Travel, Right Travel Valve 28—Arm, Boom Up 35—Boom, Arm, Bucket, Right 40—Left Travel 46—Digging Sensor Manifold 29—Arm Travel, 42—Check Valve (4 used) 62—Bulkhead 30—Bucket 36—Boom, Arm, Swing, 43—Travel Sensor Manifold 31—Boom, Arm, Bucket, Right Auxiliary Travel Shuttle Valves (24—40, 44, 45)— Pilot oil pressure from the actuated travel pilot control valves and the left and right function pilot control valves is routed by the shuttle valves (24—40, 44, 45) to shift the respective pilot valves and actuate the travel pressure sensor port TR and swing pressure sensor port S3 in the pilot signal manifold.

Continued on next page MM61211,0001519 –19–16MAY08–9/10 9025 05 23 TM2361 (24JUN08) 9025-05-23 450DLC Excavator Operation and Tests 062608 PN=661