John Deere 450DLC — Test and Adjustment

TM2361 (24JUN08) 9025-25-43 450DLC Excavator Operation and Tests 062608 PN=903 Tests 1. Connect one of the following test equipment to perform Monitoring test: Pump 1 Delivery Pressure 0.00 MPa Pump 2 Delivery Pressure 0.00MPa 1. SERVICE ADVISOR application. See SERVICE Hydraulic Oil Temperature 0 oC ADVISOR Connection Procedure for instruction. Actual Engine Speed --------min-1 (Group 9015-20.) –19–03MAR06 Access Boom Mode Circuit Relief Valve Test. ON Or select the following items from the menu: 1 2 3 4 5 • Pump 1 Delivery Pressure • Pump 2 Delivery Pressure 6 7 8 9 0 TX1003295 F1 F2 F3 F4 • Hydraulic Oil Temperature • Actual Engine Speed • Boom Mode Switch Monitor Display 2.

See Personal Digital Assistant (PDA) Connection To 15 Excavator Using Dr. ZX Application for instruction. (Group 9015-20.) 27 Select the following items from the Monitor Display: • Pump 1 Delivery Pressure • Pump 2 Delivery Pressure –UN–01FEB06 • Hydraulic Oil Temperature • Actual Engine Speed 16 TX1003196 3. See Monitor Service Menu Operation for instruction 28 to actuate the service menu on monitor in cab. (Group 9015-20.) Pump 1 and 2 Test Ports Select the following items from Monitoring list: • Pump 1 Delivery Pressure 15—Pump 1 Test Port • Pump 2 Delivery Pressure 16—Pump 2 Test Port • Hydraulic Oil Temperature 27—Pilot Pump 28—Fan Drive Pump • Actual Engine Speed 4.

Connect a gauge to test port in pump 1 and/or pump 2. Push the pressure release button on top of hydraulic oil tank to relieve pressure before removing plug from test port. Install the 4200465 Adapter (A). Connect the JT02156A Digital Pressure/Temperature Analyzer and JT02160 Transducer or a 70 000 kPa (700 bar) (10,000 psi) gauge. See JT02156A Digital Pressure/Temperature Analyzer Installation for instruction. (Group 9025-25.) SERVICE ADVISOR is a trademark of Deere & Company Continued on next page OUT3035,0000008 –19–06JUN06–2/4 9025 25 43