John Deere 450DLC — Swing Motor Leakage Test

TM2361 (24JUN08) 9025-25-62 450DLC Excavator Operation and Tests 062608 PN=922 Tests 3. To check right side swing motor: NOTE: To minimize the loss of oil until plug can be 4 installed, connect a vacuum pump to hydraulic reservoir. 3 a. Connect a vacuum pump to hydraulic reservoir. b. Disconnect drain line (2) and install JT03221 A (3/4-16 M 37°) (Parker No. 03CP-8) plug (1) in line. B B A c. Connect test hose (4) to swing motor. Put other end in calibrated container (3). 1 2 4. Run machine at specifications. Specification Engine—Speed............................................................................

Fast Idle Work Mode Switch—Position...................................................... Dig Mode Power Mode Switch—Position.............................. HP (High Power) Mode Auto Idle Switch—Position.................................................................... Off –UN–09MAY01 Boom Mode Switch—Position............................................................... Off CAUTION: Move machine to an area with a level surface and enough room to swing the T142021 upperstructure. Clear area of all bystanders before performing test to avoid personnel Right Side Swing Motor Leakage Check Lines injury. 1—Plug 5. Actuate swing function for one minute.

Compare 2—Drain Line amount of leakage to specified amount. Repeat for 3—Calibrated Container 4—Test Hose swing in opposite direction. 9025 25 62 Specification New Swing Motor—Swinging— Leakage............................................................................... 0.2—0.3 L/min 6.8—10.2 oz/min Continued on next page LD30992,000028B –19–05JUN06–3/4