John Deere 450DLC — Swing Motor Leakage Test

TM2361 (24JUN08) 9025-25-63 450DLC Excavator Operation and Tests 062608 PN=923 Tests 6. To check left side swing motor: 7 a. Disconnect drain lines (1 and 7) from tee fitting and 5 connect them using JT03037 (3/4-16 M 37° x 3/4-16 M 37°) (Parker No. 0303-8-8) union (5). Install 3 1 JT03025 (3/4-16 M 37°) (Parker No. 06CP-8) cap (6) on tee. b. Connect test hose (3) to tee fitting. Put other end in A calibrated container (4). A B B 4 CAUTION: Move machine to an area with a level 6 surface and enough room to swing the upperstructure. Clear area of all bystanders before performing test to avoid personnel injury. 7. Actuate swing function for one minute.

Compare amount of leakage to specified amount. Repeat for swing in opposite direction. –UN–09MAY01 1—Drain Line 3—Test Hose 4—Calibrated Container T142022 5—Union 6—Cap 7—Drain Line Left Side Swing Motor Leakage Check Lines LD30992,000028B –19–05JUN06–4/4 9025 25 63