TM2361 (24JUN08) 9025-25-66 450DLC Excavator Operation and Tests 062608 PN=926 Tests 4. Disconnect drain line (1) at fitting (5) on motor and install JT03221 3/4-16 M 37° plug in drain line. 5. Connect line (3) to fitting (5) on motor. Place other end of line into calibrated container (4). –UN–26APR06 6. Raise track off the ground for the motor being checked. 7. Run machine at specifications. TX1006382 Specification Engine—Speed............................................................................ Fast Idle Work Mode Switch—Position...................................................... Dig Mode Travel Motor Leakage Test Power Mode Switch—Position..............................
HP (High Power) Mode Auto Idle Switch—Position.................................................................... Off 1—Drain Line Precision Mode Switch—Position.......................................................... Off 2—Plug Boom Mode Switch—Position............................................................... Off 3—Test Hose Travel Speed Switch—Position............................................. Fast (Rabbit) 4—Container 5—Fitting 8. Actuate travel function in forward, for motor being checked, for 1 minute. Record the leakage. 9. Repeat for reverse. 10. If leakage is more than specified, repair or replace motor.
If leakage is more in one direction than the other, a seal in manifold may be leaking. Specification Travel Motor—Leakage............................................... 5 L/min typical new 1.32 gpm typical new 10 L/min maximum used 2.64 gpm maximum used 9025 25 66 TX04577,00000F7 –19–05JUN06–3/3