John Deere 450DLC — Pump Flow Test

TM2361 (24JUN08) 9025-25-71 450DLC Excavator Operation and Tests 062608 PN=931 Tests 6. Disconnect the pilot lines (9 and 11) for left and right 84 travel forward. Install plugs in the lines. Leave fitting in 9 83 11 pilot caps open. 66 NOTE: Pilot lines are disconnected so travel function can be used to put pump 1 or pump 2 into stroke and not turn the tracks. 7. Disconnect the vacuum pump. 8. Check that flowmeter loading valve is open. –UN–26APR06 9. Connect one of the following test equipment to monitor pump 1 and pump 2 delivery pressure, engine speed and hydraulic oil temperature. TX1006836 1. SERVICE ADVISOR application.

See SERVICE Travel Forward Pilot Lines ADVISOR Connection Procedure for instruction. (Group 9015-20.) 9—Left Travel Forward Pilot Line Access Pump Flow Test. 11—Right Travel Forward Pilot Line Or select the following items from the menu: 66—Pilot Signal Manifold 83—Right Control Valve 84—Left Control Valve NOTE: Pump 1 and 2 control pressure and pump 1 and pump 2 flow control output signal can also be monitored. The signals must increase to increase pump displacement and flow rate. • Pump 1 Delivery Pressure • Pump 2 Delivery Pressure • Hydraulic Oil Temperature • Actual Engine Speed 2. See Personal Digital Assistant (PDA) Connection To Excavator Using Dr. ZX Application for instruction.

(Group 9015-20.) Select the following items from the Monitor Display: NOTE: Pump 1 and 2 control pressure and pump 1 and 2 proportional solenoid valve electric current signals can also be monitored. The signals must increase to increase pump displacement and flow rate. • Pump 1 Delivery Pressure • Pump 2 Delivery Pressure • Hydraulic Oil Temperature SERVICE ADVISOR is a trademark of Deere & Company Continued on next page LD30992,000028A –19–05JUN06–3/5 9025 25 71