TM2361 (24JUN08) 9025-25-72 450DLC Excavator Operation and Tests 062608 PN=932 Tests • Actual Engine Speed 3. See Monitor Service Menu Operation for instruction to actuate the service menu on monitor in cab. (Group 9015-20.) Select the following items from Monitoring list: NOTE: Pump 1 and 2 pump control pressure can also be monitored. The signal must increase to increase pump displacement and flow rate. • Pump 1 Delivery Pressure • Pump 2 Delivery Pressure • Hydraulic Oil Temperature • Actual Engine Speed 4. Connected a gauge to test port in pump 1 and/or pump 2. Push the pressure release button on top of hydraulic oil tank to relieve pressure before removing plug from test port.
Install the 4200465 Adapter (A). Connect the JT02156A Digital Pressure/Temperature Analyzer and JT02160 Transducer or a 70 000 kPa (700 bar) (10,000 psi) gauge. See JT02156A Digital Pressure/Temperature Analyzer Installation for instruction. 10. Heat hydraulic oil to specification. See Hydraulic Oil Warm-Up Procedure. (Group 9025-25.) Specification 9025 25 72 Hydraulic Oil—Temperature........................................................ 45—55°C 110—130°F 11. Run machine at specifications. Specification Engine—Speed............................................................................ Fast Idle Work Mode Switch—Position......................................................
Dig Mode Power Mode Switch—Position....................................................... P Mode Auto Idle Switch—Position.................................................................... Off 12. Actuate right travel for pump 1 or left travel for pump 2 to full actuation. Continued on next page LD30992,000028A –19–05JUN06–4/5