. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 126 5. Pass wire ropes be tween the 1 st and 2nd t rack rollers from the front and between the 1st and 2nd track ro llers from the rear. However, for machines equipped with a ful l roller guard for the track roller, p ass th e wire rope under the t rack. 6. Set t he lifting angl e (A) of the wire rope to 30° to 40° the machine slowl 7. After the machine come he roun the condition and the l ifting posture, and then lift slowly. hen lift