. OPERATION OPERATION OPERATION OPERATION Lower ripper (b) on the ground vertically so that the pin is at the lowest position. 2. Stop the engine, wait for approx. 5 minutes, then check that the oil level is between the H and L marks on sight gauge (G). NOTICE If the oil level is above the H line, do not add oil. Doing so may lead to damage to the oil pressure circuit and spouting out of oil. 3. If the oil level is below the L line, add oil through oil filler (F) at the top of the hydraulic tank. REMARK When inspecting, if the machine is at an angle, move it to a level place to carry out the check. 3 - 109 (Semi U-dozer, U-dozer Lower the blade on the ground so that backside (a) is upright.
Item Dimension Item Dimension Blade (DUAL) Tilt Cylinder length 1,292mm (50.9in) Tilt Cylinder le Blade (SINGLE) Brace 1,372mm ngth (54.1in) 1,372mm (54.1in) Ripper (VMR) Lift Cylinder length 1,543mm (60.8in) Lift Cylinder le Ripper (VMR) Tilt Cylinder le 1,543mm ngth (60.8in) Tilt Cylinder length 1,607mm (63.3in) 1,607mm ngth (63.3in)