Komatsu — EVERY 250 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE center 4 - 48 (9) Ripper arm pin (front ) (2 places) (10) Ripper ar m pin (rea r) (2 places (11) Lift cylind er bottom pin (2 places) (12) Lift cylind er head pi n (2 places (13) Tilt cylind er bottom pin (2 places) (14) Tilt cylind er head pi n (2 places ( 9) - (14) ind icate the g reasin g points for the variable multi-shank pper (15) Equalizer bar side s haft (2 places (16) Suspensi on (Equali zer bar center shaft) (1 place) 1) C arry out g reasing o f the suspension ( equalizer bar s haft) throu gh the gre ase fittings marked by arrows . 2) P ump the g reasing le ver up and down 3 t o 5 times.