. ATTACHMENTS, OPTIONS EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER PUSHING-UP SOIL 6 - 8 HARD SOIL (HARD CLAY, SHALE, ETC.) If digging is carrie d out in F pitch, and the chassis is rais ed and the blade is tilt ed, the end bit will dig i n better. 1. 2. 3. 1. Dig (A) with S TRAIGHT PITC H (1). se REAR PITCH (2). RWARD PITCH (3). ). over the top of the blade, change to STRAIGHT PITCH (1). ARD PITCH (3). ctively, and less soil is carried back. When digging gradually (A), u se REAR PITCH (2). If the g round i s hard, use FO 2. Haul ( B) with REAR PITCH (2 If there is any spillage of soil over the top of the bla de, change to STRAIGHT PI 3. Dump the soil (C) with FORW ARD PITCH (3).
This d umps th e soil more effe ctively, and less soil i s carried