BODY (UPPERSTRUCTURE) / Pilot Shut-Off Valve Installation 1. Install pilot shut-off valve (14) to bracket (6) with bolts (13) (2 used). : 50 N m (5 kgf m, 37 lbf ft) 2. Connect hoses (12, 15, 16 and 17) to pilot shut-off valve (14). : 17 mm : 19 mm : 29.5 N m (3 kgf m, 21.5 lbf ft) : 22 mm : 39 N m (4 kgf m, 28.5 lbf ft) 3. Install lever (4) to block (5) with bolts (1) (2 used). : 14 mm : 30 N m (3 kgf m, 22 lbf ft) 4. Install spring (8) to block (7) and bracket (9). 5. Install cover (10) to bracket (6) with sems bolts (11) (4 used). W4GB-02-07-003 12 13 14 : 20 N m (2 kgf m, 14.5 lbf ft) 6. Install cover (3) to bracket (6) with screws (2) (2 used). :
13 mm 15 W4GB-02-07-002 W4GB-02-07-001 W2-9-2 1 13 4 16 17 1 4 3 2 4 7 5 6 8 8 9 1 10 11 11