Deutz — 02.07.01 Main Bearing Removal

©0683 Job Card No.: 02.07.01 Page 2 of 3 Main Bearing Removal Engine: S/BVM 628 Filing No.: 0178-01-10 1836 Back bolt (10) through one turn. Connect hydr. pump with hoses and operate pump to obtain the pressure specified (Section 3.5, item 2). Introduce pin (13) - Fig. 3 - through aperture in bush (8). If annular nut (4) still resists turning, slowly raise oil pressure (10 to 20 bar). Check by mirror when pumping that the mar- king groove (Fig. 2) i n the piston will not project beyond the cylinder. Using pin (13), screw back nut (4) up to a little ahead of clamping nut (7), which requires some (9) strokes in the slot of bush (8) - Fig. 3 -. Take off oil pressure.

Disconnect hoses from tools. Remove tools and push piston into cylinder until flush with the end. Fit lever (27) - Fig. 4 -. Unscrew nuts (4) - Fig. 1 -. Lower bearing cap onto a wooden board of about 10 mm thickness in the oil sump. Should cap (17) resist lowering, use spreader (16) - Fig. 1 -. In this case, nuts (4) remain in situ. Release f oundation bolts on the engine side having no fitted studs and expand crankcase slightly with spreader (16) by turning nut (18). Unscrew nuts (4) and lower cap with lever (27) - Fig. 4 - onto a wooden board in the oil sump, as described above. © 51 256 0 Fig. 2 © 51 257 0 © 51 258 0 Fig. 4 Fig.

3 © 51 256 0 © 51 256 0 © 51 257 0 © 51 257 0 © 51 258 0 © 51 258 0